Which outcome can improperly dimensioned parts lead to?

Get more with Examzify Plus

Remove ads, unlock favorites, save progress, and access premium tools across devices.

FavoritesSave progressAd-free
From $9.99Learn more

Prepare effectively for the Introduction to Engineering and Design Test with our comprehensive study resources, including flashcards and multiple choice questions. Get insights on common topics and improve your test-taking strategies.

Improperly dimensioned parts can create significant issues in the engineering and design process, which is why increased design costs and delays is the correct outcome. When dimensions are not accurately defined or communicated, it can lead to parts that do not fit as intended, requiring rework or modifications during the manufacturing process. This rework consumes additional resources, extends production timelines, and can significantly raise costs associated with labor, materials, and machine usage. Moreover, the need for changes to designs after initial production can disrupt workflow and lead to project delays.

In contrast, the other outcomes listed are not likely to result from improper dimensioning. For example, faster production times and higher employee satisfaction can only be achieved when the design process is smooth and well-coordinated, which improper dimensioning disrupts. Similarly, while innovative products can emerge from effective design practices, improper dimensioning is more likely to hinder creativity due to constraints and errors that must be resolved rather than fostering innovation. Thus, the consequences of poor dimensioning are primarily cost and time-related, making increased design costs and delays the most accurate outcome.

Subscribe

Get the latest from Examzify

You can unsubscribe at any time. Read our privacy policy